Plant 5 is located in Bio Campus 2 and is scheduled for completion in April 2025, with a production capacity of 180,000 liters.
Plant 6 is located in Bio Campus 2 and is scheduled for completion in 2032, with a production capacity of 180,000 liters.
Plant 7 is located in Bio Campus 2 and is scheduled for completion in 2032, with a production capacity of 180,000 liters.
Innovation
The Samsung Biologics Open Innovation Center is located in Bio Campus 2 and is scheduled for completion in 2032.
-
Total Capacity
by 2032
-
720 kL
-
Bio Campus II advances scalable biomanufacturing through digitally
connected systems, real-time data visibility, automation, and standardized
processes across manufacturing operations.

-
Plant 5
180 kL 15KL x2
-
Plant 5 features a total capacity of 180 kL with integrated digitalized operations designed to enhance manufacturing efficiency, flexibility, and scalability.

- C-Lab Outside
-
Partnering with Lilly Gateway Labs (LGL), Samsung Biologics will develop and operate a 'C-Lab Outside' within Bio Campus II to support collaborative biopharmaceutical research and innovation.
Related Content
